February 19, 2026 City Council Meeting
- Date
- 2026-02-19 3:30pm
- Type
- Special Meeting
- Agenda
- Agenda (PDF)
- Packet
- Agenda packet (PDF)
- Record page
- Meeting record
- Video
- not found (no public recording located)
- Transcript
- not transcribed
minutes approved No video recording was found for this special meeting (Thursday, 3:30 p.m., Parks and Recreation Building community room). This summary comes from the approved minutes (approved Mar 10, 2026; printed in the Mar 10 agenda packet) and the agenda.
No video: No video recording was found for this meeting; this summary is from the minutes and agenda.
What happened
- The largest contract of 2026 so far: a construction contract of up to $32,357,000 with Swinerton Builders for the Smith Park Aquatic Center renovation, with about $7.3 million in budget transfers to fund it.
- Only three members (Garcia, Lara, Sánchez) were present; Mayor Pro Tem Sánchez presided. The approved minutes list Camacho and Lutz as both absent and voting no, which is internally inconsistent (FL14). The meeting lasted 13 minutes.
Agenda items, in order
Call to order
Mayor Pro Tem Sánchez called the meeting to order at 3:35 p.m. Present: Garcia, Lara, Sánchez. Absent: Camacho, Lutz.
Outcome: Quorum of three. No public comments.
1. Smith Park Aquatic Center renovation: Swinerton Builders construction contract
Smith Park Aquatic Center Renovation Project, CIP No. 50043 – Award of Construction Contract
Public Works Director Negrete summarized the award process and said the groundbreaking was expected in June or July. The City Manager said staff would look for ways to speed up construction. Funding moves: $400,000 from the Alebrije Dog Park project, $200,000 from the Teen Center renovation, $2,114,885 in SB 1 road money (swapped through the road resurfacing project), $545,875 from the General Fund balance and $4,000,000 from the Landscaping Assessment District through the General Fund.
Outcome: Awarded per the minutes (Agreement 26-2529): up to $32,357,000. Motion by Lara, second by Garcia. The roll call printed is AYES: Garcia, Lara, Sánchez; NOES: Camacho, Lutz, even though both were listed absent.
⚑ Record inconsistency (FL14): the approved minutes list Camacho and Lutz as absent and also as voting no, and repeat the same vote block after the adjournment. The likely reading is a 3-0 vote with two absent, but this is unverified. With no video, it cannot be checked; the City Clerk could confirm. · Connections
⚑ Swinerton Builders: no campaign-finance link to council members was found in the filings reviewed (selected periods). Staff later described prequalifying the pool contractors (see Jul 14, 2026). · Vendor: Swinerton Builders · Jul 14, 2026 meeting
Adjournment
Outcome: Adjourned at 3:48 p.m. (minutes).
Connections, recusals and disclosures
Documented connection, not evidence of impropriety.
- Record inconsistency (FL14): the approved minutes list Camacho and Lutz as absent and also as voting no, and repeat the same vote block after the adjournment. The likely reading is a 3-0 vote with two absent, but this is unverified. With no video, it cannot be checked; the City Clerk could confirm. · Connections (item)
- Swinerton Builders: no campaign-finance link to council members was found in the filings reviewed (selected periods). Staff later described prequalifying the pool contractors (see Jul 14, 2026). · Vendor: Swinerton Builders · Jul 14, 2026 meeting (item)
Records for this meeting
Key votes
| Date | Item | Outcome | Votes | Evidence |
|---|---|---|---|---|
| 2026-02-19 | Award $32,357,000 construction contract (Swinerton Builders) for Smith Park Aquatic Center renovation, plus budget transfers including $4,000,000 from Landscaping Assessment District and $2,114,885 of road-resurfacing funds | Approved; printed roll call 3 aye - 2 no | Camacho: NO Sánchez: AYE Lara: AYE Lutz: NO Garcia: AYE | unverified Source |
Contracts
| Date | Item | Vendor | Amount | Outcome | Evidence |
|---|---|---|---|---|---|
| 2026-02-19 | Smith Park Aquatic Center Renovation Project, Cip No. 50043 – Award Of Construction Contract | Swinerton Builders | $32,357,000 | Approved per minutes (roll call internally inconsistent - UNVERIFIED) | unverified |
Full transcript
No video recording was found for this meeting, so there is no transcript. The summary uses the minutes and agenda.
Public comments
No public comments were made (minutes).
No public comments were made at this meeting.
Council member comments and reports
Special meetings have no council reports.